🈶
中文翻译 · AI 生成,以原文为准
I. Integrated Project Electrical Control Delivery Oversight
1. Full-cycle electrical control management: Deeply participate in the entire integrated project process (from design to launch), conduct technical review of third-party equipment (conveyor lines, lifts, narrow-belt sorters, case openers, palletizing equipment, etc.) electrical control design plans, electrical schematics, IO point tables, and component selection, ensuring reliability, safety, and maintainability of integration with Hai Robotics WCS/WMS systems.
2. Control logic and risk review: Review and optimize third-party PLC control logic, identify design defects and potential risk points; lead or guide on-site electrical control commissioning, system integration testing, and troubleshooting, and bear final technical responsibility for third-party electrical control delivery quality.
3. Cross-party interfaces and issue closure: As the sole electrical control interface person for the project, coordinate third-party integrators, customer engineering teams, internal delivery and product teams, and establish a closed-loop mechanism for on-site electrical control issues (discovery → localization → resolution → retrospective review).
4. Risk front-loading and acceptance output: Produce project-level electrical control risk assessment reports and delivery acceptance checklists, proactively preventing electrical control failures during commissioning and after launch.
II. Hai Robotics Electrical Control Standards Development
1. Standard formulation: Based on business scenarios, Hai Robotics products, and mainstream partner solutions, gradually establish electrical control design standards, selection specifications, interface specifications, and acceptance standards.
2. Component platformization and cost reduction: Promote platformization and selection convergence of electrical control components such as PLCs, servos, inverters, sensors, and safety devices, and quantify cost reduction results in procurement and delivery.
3. Risk and fault library development: Systematically organize electrical control risk lists and typical fault libraries, forming reusable risk control mechanisms and design checklists.
4. Knowledge accumulation: Accumulate typical electrical control solutions, issue libraries, and best practices, feeding back into product definition and delivery teams to improve overall delivery consistency and efficiency.
Hard Requirements
- Bachelor's degree or above in Electrical Engineering and Automation, Automation, Mechatronics, or related majors.
- 7+ years of electrical control experience in warehouse/logistics automation or industrial automation, including at least 2+ medium-to-large integrated projects where the candidate led electrical control design and on-site delivery.
- Proficient in mainstream PLC programming and logic design (Siemens S7-1200/1500, Beckhoff, Mitsubishi, etc., with in-depth knowledge of at least one), able to independently complete or review complex control logic.
- Familiar with servo drives, inverters, safety relays/safety PLCs, safety circuit design, and industrial buses (Profinet / EtherCAT / Profibus / CANopen, etc.).
- Familiar with the electrical control architecture, control principles, and selection logic of common logistics equipment such as conveyors, sorters, lifts, palletizers, and buffer storage.
- Familiar with electrical safety and standards, understanding of electrical schematic design, cabinet layout, grounding systems (TN-C / TN-S), three-phase power supply; experience with UL 508A or related international electrical standards is preferred.
- Solid on-site control capability, able to independently drive complex, cross-party collaborative projects to completion.
Competencies
- Technical depth: Recognized expert-level judgment in the electrical control field, able to quickly identify design risks and optimization opportunities in third-party solutions.
- Standardization mindset: Ability to abstract scattered experience into standards, specifications, and checklists, rather than merely solving isolated problems.
- Cross-team collaboration and influence: Able to effectively coordinate and drive progress among third-party integrators, customers, and internal teams, earning trust through professionalism.
- Results-oriented: Aiming for delivery quality, cost reduction results, and controllable risk, able to quantify the value of own work.
- Willingness to grow: Recognizes the transition from senior expert to team leader, willing to take on mentoring and team-building responsibilities.
Bonus Points
- Project experience integrating AMR / AGV / multi-shuttle / Miniload systems with WCS/WMS.
- Electrical control delivery experience in cross-vendor, cross-border (e.g., Europe, Southeast Asia) integrated projects.
- Successful experience building an electrical control standards system or selection platform from 0 to 1.
- Experience forming or mentoring a small technical team.